Peel And Stick Roofing Vs Hot Mop

But peel and stick assuming you mean peel and stick roofing not peel and stick water barrier and hot mop are permanent roofing types so unless you mean changing from tile to a membrane roofing which would be pretty rare if the roof slope is enough that the tile worked right for 25 years i fail to understand the question.
Peel and stick roofing vs hot mop. Gaf liberty 3 ft. No roof removal required less debris no smell of tar no direct flames on the roof. Off the cuff typical range of roof lives not counting repairs if physically pierced maybe 8 20 for built up tar and felt hot mop 10 20 for peel and stick 12 25 or even up to 30 for tpo epdm uv protected pvc like hypalon 30 50 for hdpe. The traditional approach in florida has been a 30 pound felt base sheet nailed to the deck and with 90 pound roll roofing cap sheet hot mopped on top.
However after 20 years or so in the heat the 30 90 hot mop system was prone to cracking and failure. B an approved peel and stick membrane adhered to roofing felt mechanically fastened to the roof sheathing. Mid states asphalt manufactures a quik stick ice and water sand peel and stick product in a 200 square foot roll which has a lightly abrasive sandy surface for traction during installation. Comes with a warranty that is viewed as above average.
This formed a very durable heavy duty underlayment that sealed well. To begin the hot mop process a layer of hot asphalt will be spread on top of the roof s base sheet. A roofing secret that is gaining some serious traction is self adhered underlayments aka peel and stick. Though hot mop installations were the methods of choice thru about 15 years ago self adhered systems are now proving to be the superior underlayment solution.
Easy and fast application. Applying the hot mop in progress is the second step to a general re roofing process acting as a secondary barrier between dry materials and tiles. C minimum 4 inch wide peel and stick tape over all seams in the roof sheathing covered by an approved underlayment astm 30 felt or an approved synthetic d a mechanically fastened base sheet covered with a hot mop cap sheet. It serves to protect the base sheet on your roof and keep it watertight.
A modified bitumen cap sheet is then applied to the asphalt and both layers are nailed to the roof. The pros of the hot mop option. The asphalt is applied to the roof using a heated mop. Ft sbs self adhering cap sheet roll for low slope roofing in shakewood.